Solution 09
Production transfer
Move a running assembly from your current vendor — same print, same connector part numbers, pilot lot verified side-by-side before cutover. For tariff moves, lead-time fixes, and second-source insurance.
Transfer pilot lot — side-by-side check
Capabilities
What this service covers
Typical working ranges. Outside them? Send the drawing anyway — the engineering review will say what's possible.
| Input | Current print, BOM, and golden samples from the running line |
| Fidelity | Same connector part numbers — no silent substitutions |
| Gap review | Print vs. samples reconciled; differences raised before quoting |
| Pilot lot | Built and checked side-by-side against golden samples |
| Cutover | Under revision control, on your schedule — no forced switch |
| Records | COC and test records from the first lot onward |
| Common reasons | Tariff exposure, lead times, single-supplier risk |
How it runs
How production transfer runs here
01
Drawings & samples in
Current documentation plus golden samples from the incumbent.
02
Gap & risk review
Every difference between print and reality documented.
03
Pilot lot
Side-by-side against golden samples; you judge the match.
04
Cutover
Volumes shift on your schedule, revision-controlled.
Golden sample comparison photo
Pilot lot photo
Cutover documentation photo